九色精品系列精品在线探花|黄色视频网页九九国产精品|国产一区国产一区国产一区国产二区|亚洲av中文无码乱人伦在线咪咕|国产精品日韩无码加勒比视频一区|午夜剧场欧美A级毛片|国产无套内射普通话|亚洲国产成人在线视频观看|日本3p群交干b|久久精品自慰

首頁(yè) 資料分類 用戶榜 | 積分說(shuō)明    

  ·Development and Implementation


資料星級(jí): 資料格式:pdf
上 傳 者:Alex1989 下載次數(shù):1
上傳時(shí)間:2010-09-01 21:07:25

5分
224KB
收藏  舉報(bào)     發(fā)送給好友

  詳細(xì)介紹: 發(fā)表評(píng)論   
wells were required for field development. Five were predrilled
to total depth before the TLP was installed at the site.
These wells are referred to as “pre-drilled” wells, and they will
be completed and produced through 10-¾” production risers.
The remaining three wells, referred to as “batch-set” wells,
were pre-drilled to an intermediate depth, and their 13-5/8”
casing strings were set. Final drilling for these three wells will
be performed by the TLP rig.
  該用戶還有這些資料: 更多   

Field Trial Proves ...

Operation of Two Ne...

THE KAPOK DEVELOPME...

New Directions in T...

Girassol: Drilling ...

Geohazards: Are We ...

Nansen/Boomvang Pro...

Ceiba Field Subsurf...

Prediction of P-Wav...


 
  其他相關(guān)資料: 更多   

Crude Oil and Natur...

THE KAPOK DEVELOPME...

The development of ...

Production Geology

Development Strateg...

Development and Imp...

LATE QUATERNARY STR...

1999 Development an...